commonly encountered in existing buildings during
retro-commissioning processes. It focuses on pump and system
interaction, with a primary focus on the parallel pump arrangements
that are common in heating, ventilation, and air-conditioning
(HVAC) applications.
A case study format is presented for readers. Each example is
presented in the following context:
- What were the indicators of the problem and how can the problem
be corrected?
- Are there any "ripple" effects associated with the
problem?
- How can the costs and benefits be assessed and can persistence
be ensured?
- How can the problem be prevented in future projects?
|